Office Relocation with Zero Downtime
KEY OUTCOMES
Zero downtime
Faster internet at a lower monthly cost
Finished ahead of schedule and under budget
THE CHALLENGE
Client: Bay Area high-tech manufacturer, 78 employees, 2 sites, hybrid on-premises and cloud systems.
How a High-Tech Manufacturer Moved Its Entire IT Infrastructure With Zero Downtime
The company was moving to a new facility to support growth. Its production schedule was tight, so downtime was not an option. Its systems were split between on-premises servers and the cloud, and its users were spread across locations that all needed continuous connectivity. The new building had no finished server room, no upgraded cabling, and no high-speed internet.


WHAT WE DID
- Joined the planning stage early. We worked with property management, contractors, and service providers before the move. Not during it.
- We designed and laid out the server room. We directed the structured cabling installation to support all user and ISP services.
- We renegotiated with the existing ISP for faster speed at a lower monthly cost, and included a redundant connection with more bandwidth at a better price.
- Moved critical systems in a controlled sequence. We tore down and moved the core infrastructure in stages so services stayed available throughout the move by connecting a point-to-point connection between the old and new facility.
- Rebuilt and tested within hours, not days. The core systems were transported, reinstalled, and tested in less than six hours.
THE RESULTS
- Zero downtime during the relocation.
- Internet 2x faster at 9% lower monthly cost.
- Backup performance and reliability improved by 3x.
- Infrastructure work finished ahead of schedule by two weeks and under budget by 12%.
- Total operating costs reduced by 10.5% per year.

"CyberHAWKS' planning and creativity meant zero impact on our staff or customers."
- CTO
NEXT STEP:
Planning a move or an expansion?
Take our free 90-second security gap assessment or call us